Kiriwaneliya Mini Hydropower Project which is developed by Country Energy Pvt Ltd is located in Kiriwaneliya village in Nuwara Eliya district of the central province, Sri Lanka. The purpose of the Project is to utilize the water resources of Maskeli Oya to generate electricity, which will be delivered to Ceylon Electricity Board´s Power Grid. The Project is a run of-river hydro power with a total installed capacity of 4.65MW. The main access to the project site is from A7 road. The powerhouse site can be reached from the Norton-Bridge-Makeliya main road. The weir site can be reached from a footpath to Laxapana fall (about 3 km) whereas the powerhouse site can be approached from the Gansabha road starting near the control valve house of the Laxapana hydroelectric project.

 
Monthly Power Generation
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
 
Units
kWh
Units
kWh
Units
kWh
Units
kWh
Units
kWh
Units
kWh
Units
kWh
Units
kWh
Units
kWh
Units
kWh
Units
kWh
 January
524,501
691,520
405,189
256,327
137,014
318,534
216,767
309,797
543,389
401,119
282,701
 February
460,880
390,349
337,301
166,101
77,764
190,532
238,157
104,962
286,098
191,993
155,016
 March
519,945
2,132,460
214,260
112,704
222,760
272,157
97,442
76,160
368,260
311,267
232,700
 April
452,010
1,315,741
432,480
209,603
208,152
473,454
220,245
107,450
657,793
718,836
380,418
 May
1,487,403
868,319
431,399
1,982,432
1,205,142
1,573,782
335,567
1,628,430
2,235,926
2,589,815
844,105
 June
2,951,680
2,666,840
965,100
2,217,200
2,215,684
2,862,347
1,188,600
1,934,892
2,408,548
1,913,555
1,475,093
 July
3,258,958
2,499,591
1,975,130
977,508
1,372,996
2,485,378
1,427,340
1,599,392
2,317,019
2,291,270
1,367,533
 August
2,084,777
2,559,410
1,253,120
1,019,361
2,670,771
2,841,860
2,218,409
2,197,343
2,604,565
2,447,654
575,156
 September
2,610,198
1,531,560
1,767,760
897,979
2,422,304
927,715
2,164,213
2,399,007
2,671,033
1,824,224
 October
1,550,250
1,766,299
2,227,161
1,016,166
2,628,849
1,847,122
2,830,167
2,096,325
3,143,808
2,891,068
 November
979,851
1,253,200
2,056,308
1,157,681
1,601,985
968,949
1,686,574
799,817
2,923,788
1,573,986
 December
558,220
1,039,481
990,782
256,096
1,121,166
598,131
1,255,055
812,722
1,048,893
645,954
 Total
17,438,673
18,714,770
13,055,990
10,269,158
15,884,587
15,359,961
13,878,536
14,066,297
21,209,120
17,800,741
5,312,722
Project Highlights

Kiriwaneliya Mini Hydropower Project which is developed by Country Energy Pvt Ltd is located in Kiriwaneliya village in Nuwara Eliya district of the central province, Sri Lanka. The purpose of the Project is to utilize the water resources of Maskeli Oya to generate electricity, which will be delivered to Ceylon Electricity Board´s Power Grid. The Project is a run of-river hydro power with a total installed capacity of 4.65MW. The main access to the project site is from A7 road. The powerhouse site can be reached from the Norton-Bridge-Makeliya main road. The weir site can be reached from a footpath to Laxapana fall (about 3 km) whereas the powerhouse site can be approached from the Gansabha road starting near the control valve house of the Laxapana hydroelectric project.

 
Monthly Power Generation
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
 
Units
kWh
Units
kWh
Units
kWh
Units
kWh
Units
kWh
Units
kWh
Units
kWh
Units
kWh
Units
kWh
Units
kWh
Units
kWh
 January
524,501
691,520
405,189
256,327
137,014
318,534
216,767
309,797
543,389
401,119
282,701
 February
460,880
390,349
337,301
166,101
77,764
190,532
238,157
104,962
286,098
191,993
155,016
 March
519,945
2,132,460
214,260
112,704
222,760
272,157
97,442
76,160
368,260
311,267
232,700
 April
452,010
1,315,741
432,480
209,603
208,152
473,454
220,245
107,450
657,793
718,836
380,418
 May
1,487,403
868,319
431,399
1,982,432
1,205,142
1,573,782
335,567
1,628,430
2,235,926
2,589,815
844,105
 June
2,951,680
2,666,840
965,100
2,217,200
2,215,684
2,862,347
1,188,600
1,934,892
2,408,548
1,913,555
1,475,093
 July
3,258,958
2,499,591
1,975,130
977,508
1,372,996
2,485,378
1,427,340
1,599,392
2,317,019
2,291,270
1,367,533
 August
2,084,777
2,559,410
1,253,120
1,019,361
2,670,771
2,841,860
2,218,409
2,197,343
2,604,565
2,447,654
575,156
 September
2,610,198
1,531,560
1,767,760
897,979
2,422,304
927,715
2,164,213
2,399,007
2,671,033
1,824,224
 October
1,550,250
1,766,299
2,227,161
1,016,166
2,628,849
1,847,122
2,830,167
2,096,325
3,143,808
2,891,068
 November
979,851
1,253,200
2,056,308
1,157,681
1,601,985
968,949
1,686,574
799,817
2,923,788
1,573,986
 December
558,220
1,039,481
990,782
256,096
1,121,166
598,131
1,255,055
812,722
1,048,893
645,954
 Total
17,438,673
18,714,770
13,055,990
10,269,158
15,884,587
15,359,961
13,878,536
14,066,297
21,209,120
17,800,741
5,312,722
Project Highlights

Vallibel Power Erathna PLC. All rights reserved. Solution by Affno