Kiriwaneliya Mini Hydropower Project which is developed by Country Energy Pvt Ltd is located in Kiriwaneliya village in Nuwara Eliya district of the central province, Sri Lanka. The purpose of the Project is to utilize the water resources of Maskeli Oya to generate electricity, which will be delivered to Ceylon Electricity Board´s Power Grid. The Project is a run of-river hydro power with a total installed capacity of 4.65MW. The main access to the project site is from A7 road. The powerhouse site can be reached from the Norton-Bridge-Makeliya main road. The weir site can be reached from a footpath to Laxapana fall (about 3 km) whereas the powerhouse site can be approached from the Gansabha road starting near the control valve house of the Laxapana hydroelectric project.

 
Monthly Power Generation
2012
2013
2014
2015
2016
2017
2018
2019
 
Units
kWh
Units
kWh
Units
kWh
Units
kWh
Units
kWh
Units
kWh
Units
kWh
Units
kWh
 January
283,378
524,501
691,520
405,189
256,327
137,014
318,534
216,767
 February
202,898
460,880
390,349
337,301
166,101
77,764
190,532
238,157
 March
169,073
519,945
2,132,460
214,260
112,704
222,760
272,157
97,442
 April
654,571
452,010
1,315,741
432,480
209,603
208,152
473,454
220,245
 May
318,800
1,487,403
868,319
431,399
1,982,432
1,205,142
1,573,782
 
 June
766,928
2,951,680
2,666,840
965,100
2,217,200
2,215,684
2,862,347
 
 July
1,648,010
3,258,958
2,499,591
1,975,130
977,508
1,372,996
2,485,378
 
 August
1,332,069
2,084,777
2,559,410
1,253,120
1,019,361
2,670,771
2,841,860
 
 September
1,717,789
2,610,198
1,531,560
1,767,760
897,979
2,422,304
927,715
 
 October
1,355,150
1,550,250
1,766,299
2,227,161
1,016,166
2,628,849
1,847,122
 
 November
1,662,117
979,851
1,253,200
2,056,308
1,157,681
1,601,985
968,949
 
 December
885,458
558,220
1,039,481
990,782
256,096
1,121,166
598,131
 
 Total
10,996,241
17,438,673
18,714,770
13,055,990
10,269,158
15,884,587
15,359,961
772,611
Project Highlights

Kiriwaneliya Mini Hydropower Project which is developed by Country Energy Pvt Ltd is located in Kiriwaneliya village in Nuwara Eliya district of the central province, Sri Lanka. The purpose of the Project is to utilize the water resources of Maskeli Oya to generate electricity, which will be delivered to Ceylon Electricity Board´s Power Grid. The Project is a run of-river hydro power with a total installed capacity of 4.65MW. The main access to the project site is from A7 road. The powerhouse site can be reached from the Norton-Bridge-Makeliya main road. The weir site can be reached from a footpath to Laxapana fall (about 3 km) whereas the powerhouse site can be approached from the Gansabha road starting near the control valve house of the Laxapana hydroelectric project.

 
Monthly Power Generation
2012
2013
2014
2015
2016
2017
2018
2019
 
Units
kWh
Units
kWh
Units
kWh
Units
kWh
Units
kWh
Units
kWh
Units
kWh
Units
kWh
 January
283,378
524,501
691,520
405,189
256,327
137,014
318,534
216,767
 February
202,898
460,880
390,349
337,301
166,101
77,764
190,532
238,157
 March
169,073
519,945
2,132,460
214,260
112,704
222,760
272,157
97,442
 April
654,571
452,010
1,315,741
432,480
209,603
208,152
473,454
220,245
 May
318,800
1,487,403
868,319
431,399
1,982,432
1,205,142
1,573,782
 
 June
766,928
2,951,680
2,666,840
965,100
2,217,200
2,215,684
2,862,347
 
 July
1,648,010
3,258,958
2,499,591
1,975,130
977,508
1,372,996
2,485,378
 
 August
1,332,069
2,084,777
2,559,410
1,253,120
1,019,361
2,670,771
2,841,860
 
 September
1,717,789
2,610,198
1,531,560
1,767,760
897,979
2,422,304
927,715
 
 October
1,355,150
1,550,250
1,766,299
2,227,161
1,016,166
2,628,849
1,847,122
 
 November
1,662,117
979,851
1,253,200
2,056,308
1,157,681
1,601,985
968,949
 
 December
885,458
558,220
1,039,481
990,782
256,096
1,121,166
598,131
 
 Total
10,996,241
17,438,673
18,714,770
13,055,990
10,269,158
15,884,587
15,359,961
772,611