Kiriwaneliya Mini Hydropower Project which is developed by Country Energy Pvt Ltd is located in Kiriwaneliya village in Nuwara Eliya district of the central province, Sri Lanka. The purpose of the Project is to utilize the water resources of Maskeli Oya to generate electricity, which will be delivered to Ceylon Electricity Board´s Power Grid. The Project is a run of-river hydro power with a total installed capacity of 4.65MW. The main access to the project site is from A7 road. The powerhouse site can be reached from the Norton-Bridge-Makeliya main road. The weir site can be reached from a footpath to Laxapana fall (about 3 km) whereas the powerhouse site can be approached from the Gansabha road starting near the control valve house of the Laxapana hydroelectric project.

 
Monthly Power Generation
2011
2012
2013
 
Units
kWh
Units
kWh
Units
kWh
 January
-
283,378
524,501
 February
-
202,898
460,880
 March
-
169,073
519,945
 April
-
654,571
452,010
 May
-
318,800
 
 June
-
766,928
 
 July
-
1,648,010
 
 August
-
1,332,069
 
 September
-
1,717,789
 
 October
-
1,355,150
 
 November
-
1,662,117
 
 December
211,923
885,458
 
 Total
211,923
10,996,241
1,957,336
Project Highlights

Kiriwaneliya Mini Hydropower Project which is developed by Country Energy Pvt Ltd is located in Kiriwaneliya village in Nuwara Eliya district of the central province, Sri Lanka. The purpose of the Project is to utilize the water resources of Maskeli Oya to generate electricity, which will be delivered to Ceylon Electricity Board´s Power Grid. The Project is a run of-river hydro power with a total installed capacity of 4.65MW. The main access to the project site is from A7 road. The powerhouse site can be reached from the Norton-Bridge-Makeliya main road. The weir site can be reached from a footpath to Laxapana fall (about 3 km) whereas the powerhouse site can be approached from the Gansabha road starting near the control valve house of the Laxapana hydroelectric project.

 
Monthly Power Generation
2011
2012
2013
 
Units
kWh
Units
kWh
Units
kWh
 January
-
283,378
524,501
 February
-
202,898
460,880
 March
-
169,073
519,945
 April
-
654,571
452,010
 May
-
318,800
 
 June
-
766,928
 
 July
-
1,648,010
 
 August
-
1,332,069
 
 September
-
1,717,789
 
 October
-
1,355,150
 
 November
-
1,662,117
 
 December
211,923
885,458
 
 Total
211,923
10,996,241
1,957,336